CAROLINE SPRINGS #4

This 7m wide allotment in Caroline Springs totalled only 208sqm.  Given the challenging nature of the allotment in terms of the building envelop that was on offer to build the home, a concerted effort was given to design a home that would be fitting to the lots location fronting the lake at Caroline Springs, while still meeting the obvious challenges that were on offer. What followed was the design and subsequent build of a 3 level state of the art home that includes high quality fixtures and fittings including Quantum quartz marble, select grade stained timber flooring, 600X300 porcelain tiles and square set cornices, plus much more.

Location: The Esplanade, Caroline Springs
Fall Over Site: Minimal
Land Size: 208sqm
Project Duration: 10 months
Soil Conditions: P Class
Project Completion Date: December 2013

CAROLINE SPRINGS #3

One of our first display homes. 

Location: Caroline Springs, Melbourne
Fall Over Site: 500mm
Land Size: 350m2
Project Duration: 6 months
Soil Conditions: "H" class
Project Completion Date: December 2009

CAROLINE SPRINGS #2

Well finished project with great use of space. On a 2m existing fill site, we used engineer designed concrete bored piers to support the structure to develop two 7.5 meter wide townhouses with rear load garages.n goes here 

Location: Caroline Springs, Melbourne
Fall Over Site: 800mm
Land Size: 420m2
Project Duration: 6 months
Soil Conditions: "P" class Project Completion Date: May 2010 

ABERFELDIE

Using the very best finishes and materials to create three quality townhouses approx 26sq each to suit a low maintenance lifestyle. With a plan of creating a home with elements of luxury living and a stylish interior....this development was surely that! 

Location: Caroline Springs, Melbourne
Fall Over Site: 1m
Land Size: 720m2
Project Duration: 10 months
Soil Conditions: "P" class
Project Completion Date: July 2011

CAROLINE SPRINGS #1

A modern look with waterviews of Lake Caroline, this Multi Unit townhouse development had many upgraded features. With over 4m of existing fill, this development required in depth consultations with engineers to determine the best method to support the development considering cost and time constratints. Screw piles was the solution in this instance.

Location: Caroline Springs, Melbourne
Fall Over Site: 1m
Land Size: 720m2
Project Duration: 10 months
Soil Conditions: "P" class
Project Completion Date: July 2011